Project & Plants

BHOLA II: Our current asset, widely known as BHOLA-II, operates a 220 MW (Natural Gas) / 212 MW (High-Speed Diesel) dual-fuel Combined Cycle Power Plant located at South Kutuba, Borhanuddin, Bhola District. The Power Plant commenced its commercial operation on June 9, 2021, and is connected to the national grid through the Bangladesh Power Development Board’s (BPDB) existing 230 KV Bhola-I switchyard.

The plant has been designed with modern pollution control measures, including NOx reduction systems, the use of cleaner primary fuel, and efficient water management utilizing the nearby Dehular Canal.

Constructed through leading EPC partners from the Shapoorji Pallonji Group, with major equipment supplied by General Electric (GE), the facility demonstrates high standards of engineering excellence and operational reliability. NBBL remains committed to delivering reliable, cleaner, and efficient electricity to support Bangladesh’s growing energy needs and contribute to the country’s sustainable development.

Plant Information

  • • Name: BHOLA II - Combined Cycle Power Plant
  • • Capacity: 220 MW (Natural Gas) / 212 MW (HSD)
  • • Configuration: 2 Gas Turbines (GE 6F.03), 2 HRSGs (HBG), 1 Steam Turbine (Triveni)
  • • Location: South Kutuba, Borhanuddin, Bhola District
  • • COD: 9 June 2021
  • • Land Area: 30.32 acres (12.89 leased + 17.43 purchased)
  • • Fuel Supply: Gas - Sundarban Gas Company Ltd (Shababpur Gas Field); HSD - Bangladesh Petroleum Corporation (India)
  • • O&M Partner: Operational Energy Group (India)
  • • Environmental Measures: NOx control, induced draft cooling tower, zero discharge into canal, ISO-certified IMS (Quality, Environment, Health & Safety).
  • • Water for the plant is sourced from Dehular Canal

Awards Recognition

Project garnered the Asset Asian Awards 2019: Power Deal of the Year (Bangladesh) as conferred by The Asset
Arrow icon
Best Annual Plant Factor of 85% in 2021-22 for an IPP in Bangladesh (source: BPDB annual report- 2021-22)
Arrow icon
Deal of The Year APAC Refinance: Power by IJ Global Awards in 2023
Arrow icon
Project garnered the Asset Asian Awards 2019: Power Deal of the Year (Bangladesh) as conferred by The Asset
Arrow icon
Best Annual Plant Factor of 85% in 2021-22 for an IPP in Bangladesh (source: BPDB annual report- 2021-22)
Arrow icon
Deal of The Year APAC Refinance: Power by IJ Global Awards in 2023
Arrow icon
Project garnered the Asset Asian Awards 2019: Power Deal of the Year (Bangladesh) as conferred by The Asset
Arrow icon
Best Annual Plant Factor of 85% in 2021-22 for an IPP in Bangladesh (source: BPDB annual report- 2021-22)
Arrow icon
Deal of The Year APAC Refinance: Power by IJ Global Awards in 2023
Arrow icon
Project garnered the Asset Asian Awards 2019: Power Deal of the Year (Bangladesh) as conferred by The Asset
Arrow icon
Best Annual Plant Factor of 85% in 2021-22 for an IPP in Bangladesh (source: BPDB annual report- 2021-22)
Arrow icon
Deal of The Year APAC Refinance: Power by IJ Global Awards in 2023
Arrow icon
Project garnered the Asset Asian Awards 2019: Power Deal of the Year (Bangladesh) as conferred by The Asset
Arrow icon
Best Annual Plant Factor of 85% in 2021-22 for an IPP in Bangladesh (source: BPDB annual report- 2021-22)
Arrow icon
Deal of The Year APAC Refinance: Power by IJ Global Awards in 2023
Arrow icon
Project garnered the Asset Asian Awards 2019: Power Deal of the Year (Bangladesh) as conferred by The Asset
Arrow icon
Best Annual Plant Factor of 85% in 2021-22 for an IPP in Bangladesh (source: BPDB annual report- 2021-22)
Arrow icon
Deal of The Year APAC Refinance: Power by IJ Global Awards in 2023
Arrow icon

Downloads

Grievance Redressal Mechanism

Final Grievance Redressal System Rev04

Download

Grievance Redressal Mechanism Bengali

Download

ESMP

EIA Approval

EIA Approval 20.04.2017

Download

EIA Approval with Gas Pipeline

Download

Final Annexures NBBL ESIA Report

ESIA Annexures January 2018

Download

Updated Final ESIA Report NBBL

Main Report January 2018

Download

ESIA Addendum

0518816 NBBL ESIA Addendum Report Final

Download

Environmental Monitoring Program

Environmental Monitoring Program

Download

Cumulative Impact Assessment

Appendix

Download

Cumulative Impact Assessment

Download